New Construction Application

It is important that you contact a United Power project coordinator and complete the appropriate application prior to the date that you desire connection of electric service to ensure that your project is not delayed. If you are unsure whether your project will require a United Power application, please contact the project coordinator for your service area.

You may also want to review United Power's rebates and programs to see if your project qualifies.

Please fill out as much information as possible on the application below, including:

  • Service size
  • Information in all required* fields
  • All available information in addition to required fields
  • Project documents required (as available per project):
    • Site Plan
    • Utility Plan (with existing and proposed)
    • Utilities/Facilities (when available)
    • Landscape Plan (when available)
    • Electric Meter(s) Location
    • Electric Transformer(s) Location (when available)
    • Approved Recorded Plat
    • Phase Map (if applicable)
    • Approved Construction Drawings
    • Approved Streetlight Locations & Type of Streetlights
Application For
(e.g. XYZ Developer / subdivision filing and phase, or Joe Smith / residence, garage, shop, commercial bldg, etc.)
(If no address, please provide nearest cross streets)
Primary Contact Information
On-site Project Manager (if applicable)
Address
Design/Construction Billing Information
Address
Permanent Meter Billing Information (once construction is complete)
Address
Electrical Contractor

Facilities Description

Phase & Voltage
Choose from below:
Panel Rating & Number of Meters
Type of Construction
Choose from below:
Comments, description or other information about service needs:
Name & Date
Unlimited number of files can be uploaded to this field.
25 MB limit.
Allowed types: txt, rtf, pdf, doc, docx, odt, ppt, pptx, odp, xls, xlsx, ods.
Signature
Sign above